Location: Intersection of US 68/KY 80 and Old Morgantown Road in Bowling Green.
Date: Aug. 12, 2001
Several of the I-beams can be seen. This is near where the new parking lot is to be built. The building in the background is the WKU parking structure. IT is on the other side of the railroad tracks and highway over which the pedestrian bridges are to be built.