[KY 884]

District 3 Report: KY 884 Bridge Work Narrows I-165; Widening on the U.S. 31-W Bypass, KY 884 and U.S. 79; U.S. 68 Realignment

Kentucky Transportation Cabinet District 3’s traffic impact report for Nov. 15 through Nov. 20 lists these widening and new-alignment projects:

  • KY 884, Bowling Green: widening to three lanes from McCoy Place to Fieldstone Boulevard, with a roundabout at Smallhouse Road, sidewalks on both sides and a new bridge over I-165 (William H. Natcher Parkway). New this week: work on that bridge closes one southbound lane of I-165 at mile point 0.5 during the day, Nov. 16 through Nov. 19.
  • US 31 (U.S. 31-W Bypass), Bowling Green: widening to five lanes from KY 234 to Park Street, still expected to be completed in late 2027, with traffic narrowed to one lane in each direction plus a center turn lane through the construction zone.
  • US 68, Green and Metcalfe counties: 1.2 miles of new alignment from near KY 729 in Green County to KY 745 in Metcalfe County, with 11-foot lanes, 4-foot paved shoulders, less curvature and grade, and a new bridge over Caney Fork Creek.
  • US 79, Todd County: widening from the Tennessee state line to mile marker 3.

The safety project on U.S. 31-E in Barren County, which includes minor widening for a 4-foot buffer between opposing lanes, again expects overnight paving to begin this week. Elsewhere, KY 90 has reopened between Franklin Street and Morgan Street after its culvert replacement.

Earlier: District 3 Report: U.S. 68 Realignment and Widening on the U.S. 31-W Bypass, KY 884 and U.S. 79

The full report from Kentucky Transportation Cabinet District 3:

Kentucky Transportation Cabinet District 3 Traffic Impact Report for Nov. 15 Through Nov. 20
The District 3 area serves Allen, Barren, Butler, Edmonson, Logan, Metcalfe, Monroe, Simpson, Todd, and Warren Counties
BOWLING GREEN, Ky. (Nov. 15, 2026) – The expected traffic impacts in the Kentucky Transportation Cabinet District 3 area for Nov. 15 through Nov. 20 are listed below. All work is subject to change.

[Read Full Text]

[US 31W]

District 3 Report: U.S. 68 Realignment and Widening on the U.S. 31-W Bypass, KY 884 and U.S. 79

Kentucky Transportation Cabinet District 3’s traffic impact report for Oct. 30 through Nov. 6 lists these widening and new-alignment projects:

  • US 68, Green and Metcalfe counties: 1.2 miles of new alignment from near KY 729 in Green County to KY 745 in Metcalfe County, with 11-foot lanes, 4-foot paved shoulders, less curvature and grade, and a new bridge over Caney Fork Creek.
  • US 31 (U.S. 31-W Bypass), Bowling Green: widening to five lanes from KY 234 to Park Street, now expected to be completed in late 2027. Traffic is narrowed to one lane in each direction with a center turn lane through the construction zone.
  • KY 884, Bowling Green: widening to three lanes from McCoy Place to Fieldstone Boulevard, with a roundabout at Smallhouse Road, sidewalks on both sides and a new bridge over I-165.
  • US 79, Todd County: widening from the Tennessee state line to mile marker 3.

A safety project on U.S. 31-E in Barren County also includes minor widening, to create a 4-foot buffer between opposing lanes, and overnight paving was expected to begin that week.

The full report from Kentucky Transportation Cabinet District 3:

Kentucky Transportation Cabinet District 3 Traffic Impact Report for Oct. 30 Through Nov. 6
The District 3 area serves Allen, Barren, Butler, Edmonson, Logan, Metcalfe, Monroe, Simpson, Todd, and Warren Counties