This page contains news and information about roads and highways in Harrison County, Kentucky.
Related image gallery: [US 62 - Miscellaneous Images]
Related news topics: [KY 19] [KY 32] [US 27] [US 62]
Chief Highway Engineers Appointed in Nine Districts
Posted: 30-Jun-2004 1:07AM CDT
Topics: Topic listing supressed. [73 topics related to this item]
Gov. Fletcher and Transportation Secretary Bailey have appointed chief highway engineers for nine of the Division of Highways' twelve districts.
More information: WKYT: Gov. Fletcher Hires New Highway Engineers (June 29, 2004) , Associated Press: Fletcher appoints top highway engineers (June 30, 2004) , Hardin County News-Enterprise: Highway engineer appointed in E'town (June 30, 2004) , Maysville Ledger-Independent: New KTC Engineer Sees District as Unique (July 2, 2004) | |
Northern Kentucky Outer Loop (I-74) Conceptual Feasibility Final Draft Released
Posted: 25-Jul-2003 7:29AM CDT
Topics: [AA Highway] [Boone County] [Bracken County] [Campbell County] [Carroll County] [Fleming County] [Franklin County] [Gallatin County] [Grant County] [Harrison County] [Henry County] [Interstate 74] [Interstate 75] [Kenton County] [KY 9] [Lewis County] [Mason County] [The Ohio River] [Owen County] [Pendleton County] [Robertson County] [Trimble County] [US 127] [US 27]
The Kentucky Transportation Cabinet has released the final report for the conceptual feasibility study for the Northern Kentucky Outer Loop, and the finding is that such an outer loop is not feasible. The proposed route would connect with I-74 in Indiana, pass into Kentucky at the Markland Dam in Gallatin County, travel east-west across Kentucky, cross the Ohio River into Ohio at the William H. Harsha bridge near Maysville, and connect with a proposed extension of I-74 in Ohio. A two-year long study of this route found that the entire route would not be financially feasible in Kentucky; however, the study found that several segments of the route would have an independent of utility. The study divided the route into six sections and assigned them the following priorities:
The study found that construction of a proposed highway (Indiana State Road 101) from I-74 in Indiana to the Markland Dam would improve the usability of the Indiana to I-71 segment of the Outer Loop. The release of the report does not guarantee that anything will be built. Construction is dependent on future funding. More information: Kentucky Transportation Cabinet Division of Planning: Proposed Interstate 74 | |
[View all Topics]
[View all News Items] |
Featured Items: [About this Site] [Hal Rogers Parkway] [Clay's Ferry Bridge] [Glen Lily Road Overpass] [Suggested Links] [Travel Information] [William H. Natcher Bridge]
Copyright © 2001-2023 by Jeffrey Carlyle. All rights reserved. This website is not associated with any government agency. |